Inside the hidden gem of the Hammer Museum’s $90-million renovation

Inside the hidden gem of the Hammer Museum’s $90-million renovation

As part of the Hammer’s two-decade, $90-million reinvention — designed by Michael Maltzan Architecture and the final phase of which debuts this week — the Grunwald Center now features a new, state-of-the-art study room and an adjacent gallery for works on paper. The gallery opened in February 2022 and the study room, which includes a high-density storage facility so that artworks can be kept practically within arm’s reach, opened in fall 2022. One promotes the other: the study room is visible from the gallery, and vice versa, through an adjoining glass door.

It’s an incredible resource — if you know it’s there.

“That’s the challenge — many people just don’t know it exists,” says Hammer Deputy Director of Curatorial Affairs Cynthia Burlingham, who’s also the Grunwald Center’s longtime director.

This post is an excerpt. Read the full article on the LA Times website.


 

Stay engaged. Use #UCLAarts to stay connected.
image   image   image   image